> ## Content Index
> Fetch the complete content index at: https://www.wwconemedia.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# Taiwan earmarks record NT$49.9 billion for local MRT construction — but funding fight heats up
- URL: https://www.wwconemedia.com/taiwan-earmarks-record-nt-49-9-billion-for-local-mrt-construction-but-funding-fight-heats-up/
- Published: 2026-09-08T06:15:10.000Z
- Updated: 2026-09-08T06:15:10.000Z
- Author: WWC NEWSDESK
- Tags: POLITICS

**TAIPEI —** Taiwan is preparing to pour a record **NT$49.9 billion (about US$1.58 billion)** into local MRT construction next year, marking a dramatic increase in central-government support as cities push ahead with major urban rail projects.

The proposed **2027 subsidy is roughly 5.5 times the NT$9 billion allocated for 2026**, making it the highest annual central subsidy for local MRT construction on record, according to Taiwan's Ministry of Transportation and Communications (MOTC).

But the huge increase has triggered a fresh dispute over how the money is being distributed, with several municipalities arguing that their individual allocations fall short of what they requested.

The central government, meanwhile, insists that the funding is **not being allocated according to political geography** and says projects are judged on their actual construction needs.

## Record MRT investment

The MOTC said the surge in funding reflects the increasing construction activity and financing requirements of local MRT projects.

Rather than simply dividing the money equally among cities, the ministry said it evaluates projects according to three major considerations: **construction progress, tender-award status and previous budget execution**.

Deputy Transportation Minister **Wu Sheng-yuan** said the government applies consistent standards across regions and does not determine funding based on whether a project is located in northern or southern Taiwan.

Projects that are further along in construction generally require larger amounts of funding, while newly launched projects receive less because their immediate spending needs are smaller.

That explanation comes amid accusations that the distribution favors southern Taiwan.

## Cities say the money isn't enough

Despite the record nationwide figure, not every local government is celebrating.

**New Taipei City**, for example, has asked the central government to restore about **NT$5.4 billion** that was cut from its requested MRT funding.

New Taipei Mayor **Hou You-yi** said the city is experiencing a peak period of transportation construction and wants funding for three MRT lines prioritized and supplemented.

Taipei has also reported a funding shortfall of about **NT$6 billion**, while Kaohsiung has said it faces a gap of approximately **NT$13.6 billion** compared with its funding requirements.

The complaints have fueled a political debate over whether the central government is favoring some regions over others.

## Government rejects north-south bias

The MOTC strongly rejected the suggestion that the subsidy system is designed to favor one part of Taiwan.

The ministry said it has provided more than **NT$716.1 billion** in cumulative subsidies for local MRT construction.

Of that total, Taipei, New Taipei and Keelung have received about **NT$488.2 billion**, or roughly **68%**, largely because northern Taiwan began building its MRT network earlier and has a larger and more mature system.

The government argues that the historical imbalance therefore reflects differences in the timing and scale of infrastructure development rather than political favoritism.

Wu said the central government looks at the actual condition of individual projects and their financial requirements instead of simply responding to how much funding a local government requests.

## Northern projects still dominate the network

Taiwan's MRT expansion is happening across several regions simultaneously.

In northern Taiwan, projects include the **Keelung MRT**, the **Taipei Metro Circular Line East Section**, the **Wanda-Zhonghe-Shulin Line** and the **New Taipei Sanying Line**.

The Sanying Line is eventually expected to connect with Taoyuan's Green Line, strengthening links between the broader Taipei metropolitan area and Taoyuan.

In central Taiwan, the **Taichung MRT Blue and Orange lines** remain at the comprehensive-planning stage.

Southern Taiwan is also seeing major expansion, with the **Kaohsiung MRT Gangshan-Luzhu Extension** and **Xiaogang-Linyuan Line** under construction. The **Tainan MRT Blue Line** has also received Cabinet approval.

## Why the subsidy jumped so sharply

The five-fold increase does not necessarily mean the government suddenly decided to spend five times more on every MRT project.

The MOTC said the higher 2027 figure reflects the fact that multiple projects have reached stages where their construction and funding requirements are significantly greater.

The ministry also noted that subsidy decisions take previous budget execution into account.

CNA reported that the government typically does not provide 100% of the requested amount in the initial allocation. For 2027, the approved amounts are roughly **80% of requests in northern Taiwan and about 70% in southern Taiwan**, based partly on historical spending rates.

Officials said local governments can seek additional funding in future years if projects move faster than expected and require more money.

## Spending scrutiny remains a major issue

The enormous increase also comes with a warning from the central government: **bigger budgets do not automatically mean bigger payouts.**

The MOTC said MRT projects are subjected to multiple reviews, including assessments by the Railway Bureau, the ministry and external experts. Projects with unclear plans or insufficient justification are not automatically funded.

This matters because Taiwan's MRT expansion involves some of the country's largest infrastructure investments, with projects stretching over several years and requiring extensive land acquisition, engineering work, procurement and construction.

The government therefore wants to avoid allocating large sums that local governments cannot actually spend.

## A massive rail-building push

The NT$49.9-billion local MRT subsidy is part of a broader push to expand public transportation and reduce dependence on private vehicles.

The central government's strategy is aimed at building more integrated rail networks, improving commuting connections and supporting economic development outside traditional urban centers.

For southern cities such as Kaohsiung and Tainan, the expansion could transform connections between residential districts, industrial areas and major transportation hubs.

For northern Taiwan, meanwhile, the challenge is increasingly about completing and connecting an already extensive MRT network.

## Record money, but a bigger question remains

The proposed **NT$49.9 billion** is undeniably a landmark figure for Taiwan's urban rail system.

But the political fight surrounding the allocation shows that the question is no longer simply whether Taiwan will spend more on MRT construction.

The bigger question is **where the money goes, how quickly it can be spent and whether the projects receiving it can deliver the transportation benefits promised to millions of commuters.**

With New Taipei, Taipei and Kaohsiung already seeking additional funding, the record budget may have opened a new battle rather than ended one.

**Taiwan has put a record amount of money on the table. Now the real fight is over who gets it—and whether the projects can turn those billions into tracks, stations and faster journeys for commuters.**

### WWC ONE MEDIA G.A